Clandestine Drug Lab Remediation Consulting
The State of California Methamphetamine Contaminated Property Cleanup Act of 2005 requires Preparation of Preliminary Site Assessment Work Plan (PSAWP) and Final Report compliance.
Meth laboratories generate health and significant environmental hazards. If you suspect that laboratories or drug users illegal operation may have impacted your property ACC will perform a site survey to determine contamination and will assist in the development of remediation work plans and clearances to ensure safe and thorough decontamination of the impacted structure.
ACC Clandestine Drug Lab Remediation Consulting include:
- Preliminary Site Assessment Work Plan
- Pre-Remediation Sampling
- CUPA approved Cleanup plan
- Post-Remediation Final Inspection and Clearance Testing
- Final Report